Right option is (b) 28 days
To elaborate: Cement blocks are prepared to test their compressive strength. With proper curing and attaining strength, these can be tested. It requires 28 days to fully cure and attain the strength of required grade, say 43 N/mm^2 for grade 43 OPC.