For fine aggregates that is, sample passing through 4.75mm IS sieve, how much sample should be taken?
(a) 5 kg
(b) 1 kg
(c) 2 kg
(d) .5 kg
This question was posed to me in examination.
My doubt stems from Sieve Analysis in chapter Materials for Construction of Basic Civil Engineering