Correct option is (a) Binders
Best explanation: Binders are provided to take the load of bridging joist and of floor toppings. Girders are placed to support binders. Screed is narrow strips of wood or bands of plaster laid on floor to act as guides to get an even surface for toppings. Top most lair of a floor is called toppings.