Rigid pavements are generally constructed in three layers – a prepared subgrade, base or sub base, and a _______________
(a) RCC
(b) Concrete slab
(c) Steel
(d) Cement slab
I had been asked this question in an interview for internship.
This intriguing question originated from Analysis of Rate of Road Work in portion Analysis of Rates of Civil Engineering Drawing