_________________ is required for preliminary studies of various aspects of a work or project.
(a) Supplementary Estimate
(b) Plinth Area Estimate
(c) Revised Estimate
(d) Abstract Estimate
I have been asked this question in class test.
The doubt is from Different Types Of Estimates in section Irrigation Works, Culverts, Bridges and Wells of Civil Engineering Drawing