____________ is a list or schedule of quantities of all the possible items of work required for construction of any building or structure.
(a) Quality survey
(b) Rate list
(c) Quantity survey
(d) Rate schedule
I have been asked this question in an international level competition.
This intriguing question comes from Estimation of Basic Rates Occurred topic in section Analysis of Rates of Civil Engineering Drawing