Centring and shuttering for flat surfaces- 4 beldars and 4 carpenters (2 class) can do 9.6 sq m (96 sq ft) per day.
(a) True
(b) False
The question was asked by my college director while I was bunking the class.
This intriguing question originated from Estimation of Basic Rates Occurred topic in chapter Analysis of Rates of Civil Engineering Drawing