If the soil is not good and does not permit vertical sides, the sides should be sloped back or protected with timber shoring. Excavated earth shall not be placed within 12m of the edge of trench.
(a) True
(b) False
The question was posed to me in a national level competition.
Origin of the question is Detailed Specifications topic in portion Specifications, Estimation of Quantities of Materials and Transport of Civil Engineering Drawing