During lime concreting in foundation the concrete shall consists of 10 cu m of brick ballast, 0.92 cu m of surkhi and 0.6 cu m of white lime in the proportion of 100:32:16 by volume.
(a) True
(b) False
This question was posed to me at a job interview.
The question is from Detailed Specifications topic in division Specifications, Estimation of Quantities of Materials and Transport of Civil Engineering Drawing