At the construction stage, binding wires ____________
(a) Should touch the formwork
(b) Should not touch the formwork
(c) To be turned outside
(d) To be turned whole structure
I had been asked this question during an interview.
I'd like to ask this question from Symptoms and Diagnosis of Distress in section Repair Technology for Concrete Structures of Concrete Technology