Correct option is (b) Filling of joints
Best explanation: The joints in the drainage system should be filled with rich cement mortar. Due to aging, the strength of cement mortar deteriorates resulting in Leakages through the cracked Joints. The remedy lies in feeling such joints, initially with epoxy resin mortar or at least at a later stage while repairing the same.