In mud-phuska terracing with tile paving, bitumen is spread over the R.C.C. slabs at the rate of ________ of bitumen per m^2 of the roof surface.
(a) 0.7 kg
(b) 1.7 kg
(c) 2.7 kg
(d) 3.7 kg
The question was asked in semester exam.
My question is based upon Flat Terraced Roofing in division Roofing Materials of Construction & Building Materials