In earthwork calculations, the average horizontal distance between the centre of deposition and the centre of excavation is known as ___________
(a) Lift
(b) Flooring
(c) Lead
(d) Embankment
The question was asked in semester exam.
Origin of the question is Estimation and Costing topic in chapter Rate Analysis, Estimation and Costing of Construction & Building Materials