In optimum time switching curve the system takes :
(a) Minimum time in reaching desired location
(b) Maximum time in reaching desired location
(c) Never reaches
(d) No desired location is present
I got this question at a job interview.
I'd like to ask this question from Construction of Phase-Trajectories topic in division Nonlinear Systems of Control Systems