Which of the following converter circuit operations will be unstable for a large duty cycle ratio?
(a) Buck converter
(b) Boost converter
(c) Buck-Boost converter
(d) Boost converter and Buck-Boost converter
The question was asked during an internship interview.
The above asked question is from Dynamics topic in chapter Dynamics of Electrical Drives of Electric Drives