Which scheduler takes their designs at design time?
(a) preemptive scheduler
(b) non preemptive scheduler
(c) dynamic scheduler
(d) static scheduler
This question was addressed to me during an online interview.
The query is from Classification of Scheduling Algorithms in section Embedded Operating System, Middleware and Scheduling of Embedded Systems