Determine the pondage factor if the plant is working at peak time of 16 hrs?
(a) 1.5
(b) 0.75
(c) 2.5
(d) 0.3
I have been asked this question in an online quiz.
The query is from Hydrographs in chapter Hydro Electric Power Plant of Energy Engineering