Which model can be selected if user is involved in all the phases of SDLC?
(a) Waterfall Model
(b) Prototyping Model
(c) RAD Model
(d) both Prototyping Model & RAD Model
This question was addressed to me in class test.
I need to ask this question from Software Life Cycle Models in section Software Engineering Basics of Software Engineering