Which of the following occurs often due to the bulkiness of a system specification document?
(a) Contradictions
(b) Ambiguities
(c) Vagueness
(d) Incompleteness
The question was posed to me during a job interview.
My question is taken from Formal Methods of Software Engineering in division Advanced Software Engineering of Software Engineering