The switch to backup power must be completed within a deadline of
(a) 50 ms
(b) 55 ms
(c) 70 ms
(d) 100 ms
I got this question during a job interview.
The doubt is from Embedded Software topic in portion Advanced Software Engineering of Software Engineering