The design period of cement concrete road is taken as ____________
(a) 30
(b) 12
(c) 5
(d) 20
This question was addressed to me in an internship interview.
My enquiry is from Design of Road Pavement topic in section Valuation, Reports Technical and Design Data of Civil Engineering Drawing