Design a rectangular sedimentation tank to treat 2.4 million litres of raw water per day. The detention period may be assumed to be 3 hours. Find overflow rate?
(a) 28,000 l/d/m^2
(b) 12,000 l/d/m^2
(c) 24,000 l/d/m^2
(d) 4,670 l/d/m^2
I had been asked this question during an interview for a job.
Question is taken from Principle for the Preparation of Water Supply topic in section Valuation, Reports Technical and Design Data of Civil Engineering Drawing