According to IRC:15-2002 _______% Fly ash is required to be replaced with the total cementitious materials.
(a) 15
(b) 20
(c) 25
(d) 30
I had been asked this question during an internship interview.
Asked question is from Road Method of Mix Design in division Concrete Mix Design of Concrete Technology