What is the time required to give heating to remove the moisture from the concrete?
(a) 6-8 hrs
(b) 10 hrs
(c) 24 hrs
(d) 48 hrs
I had been asked this question by my college director while I was bunking the class.
The above asked question is from Concrete Cloth, Polymer Impregnated Concrete topic in division Special Concrete and Concreting Methods of Concrete Technology