Quality control helps to ___________ the risks of overdesign that ___________ the overall cost.
(a) Maximize, Increase
(b) Minimize, Increase
(c) Maximize, Decrease
(d) Minimize, Decrease
The question was posed to me by my school teacher while I was bunking the class.
I need to ask this question from Quality Management in Concrete Construction topic in chapter Quality Control of Concrete Technology