Two successive Iso-hyetes in the basin drawing of catchment area are measured using _______
(a) Planimeter
(b) Manometer
(c) Mass flow meter
(d) Chronometer
This question was addressed to me at a job interview.
Question is taken from Rainfall and its Measurement topic in chapter Hydro Electric Power Plant of Energy Engineering