A particle of mass 100g is thrown vertically upwards with a speed of 5m/s. The work done by the force of gravity during the time the particle goes up is ___________
(a) 1.25J
(b) 0.5J
(c) -0.5J
(d) -1.25J
This question was posed to me in exam.
The origin of the question is Work Done topic in chapter Kinematics of Engineering Physics I